Wastewater treatment plant, Finland 258 kW

Owner
HSY
Completion time
2016
Location
Mühlhausen, Thüringen, Germany
Overall module power
258 kWp

The 258 kW system installed on the roof of the largest wastewater treatment plant in the Nordic countries. The system is divided into six different roofs, with a part layer on top of roof covering. Due to the innovative installation system, the installation is light and safe.