Wastewater treatment plant, Finland 258 kW
- Owner
- HSY
- Completion time
- 2016
- Location
- Mühlhausen, Thüringen, Germany
- Overall module power
- 258 kWp
The 258 kW system installed on the roof of the largest wastewater treatment plant in the Nordic countries. The system is divided into six different roofs, with a part layer on top of roof covering. Due to the innovative installation system, the installation is light and safe.